Transport in Estonia
Transport in Estonia relies mainly on road and rail networks. The country has a relatively dense road network, a growing tram network in Tallinn, and a growing electric vehicle charging infrastructure.
Road and Rail Networks
The total road network in Estonia is 57,565 km, which includes 16,465 km of national roads. The national roads form the core of the Estonian road network, with a total length of 16,489 km. Of these, 67% are paved. The national roads are divided into four classes according to importance: main roads (1,607 km), basic roads (2,406 km), secondary roads (12,476 km), and local roads (18,455 km).
The rail network consists of 900 km of common carrier lines only, and 1,200 km including dedicated industrial lines. The gauge is 1,520 mm (4 ft 11+27⁄32 in) or 1,524 mm (5 ft). The Rail Baltica project, which aims to link a high speed line through Latvia and Lithuania to Poland, is scheduled for completion in 2030, with a start of services on some of the sections in 2028.
Electric Vehicles and Public Transport
Estonia is the first country in the EU and in the world to introduce a nationwide, publicly serviced charging system for charging the batteries of electric vehicles. This network consists of 165 fast charging stations, which are equipped with connectors of the CHAdeMO standard. These stations are located throughout the entire country, including the islands, and have a maximum distance of 40–60 km in between.
The charging stations can also be navigated via a smartphone app (currently only for Android). The relatively dense network and 30 minute quick charges are built to enable a country-wide electric vehicle network. The system offers a unitary booking service and several different tariffs, some of which appear attractively low priced.
The tram network in Tallinn has been growing since 1888, when traffic was started by horse-powered trams. The first line was electrified on October 28, 1925. The first electric trams were built by Dvigatel, Ltd., in Tallinn before World War II and for some years after that, the last one in 1954.
Since 1955 to 1988 German-built trams were used. In total, there were 20 LOWA T54-B54 trams (in use from February 1955 to March 1977), 11 Gotha T57-B57 (in use from January 1958 to June 1978), 5 Gotha T59E-B59E (in use from June 1960 to February 1980), 14 Gotha T2-62 and B2-62 (in use from 1962 to 1981) and 50 Gotha G4 trams (in use from January 1965 to October 1988) trams.
The first Czechoslovak-built ČKD Tatra T4SU arrived in 1973. The T4SU trams were in use from May 1973 to September 2005 and there were 60 of them. The first KT4SU arrived in Tallinn in 1981 and was first in use on March 10, 1981.
Summary of the Estonian Transport Network
- Total road network: 57,565 km.
- National roads: 16,489 km.
- Tram network in Tallinn: Growing since 1888.
- Electric vehicle charging stations: 165 fast charging stations.
This article was written with AI assistance from multiple news reports and is reviewed by our editors under our editorial principles. Editorial Standards · Tips & Contact
Comments 0